Saturday 18 June 2011

up to the floor

The steel cages are placed in the trenches and then covered. Andy, the groundworker says that no-one ever says "that house has lovely foundations"!
So here is a record of our appreciation.
Bricks are built up to the level of the damp proof course:
Tidying up:
Then the floor beams are swung in to place:


No comments:

Post a Comment