Rob has been levelling the ground outside - not an easy job, but finally is ready to lay the paving blocks. He and Stuart have been dodging the rain to get the work done - but it is a lot easier than when he was here before (see 7th February)

The mosaic in the bathroom is finally finished - each piece put in individually. So the bath is installed (but not yet wired up for whirlpooling)


The rest of the bathroom will be done in the next few days and we move on to Bedroom 3 (the large front bedroom, destined to be my sewing room)