Stepping through the "front door"
Standing at the entrance to the living room
Looking through the study window to the High St.
The view from upstairs
On July 11th the mechanical heat recovery & ventilation pump, and the roof get craned into position
Thursday, 7 July 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment