Friday 16 December 2011

the garage

This sits in the front of the house, and will, of course, be Keith's workshop. The space between the garage and house will be roofed in and be a porch.
The garage is not timber framed. John, our bricklayer and his team have just begun work, this shows him laying the black plastic to the floor ( a bit blurry as I took this in very dim light at 3.30pm yesterday).

This was followed by insulation (no photos as I was helping lay it)
This morning, the strengthened concrete floor was poured.

The precess was similar to the screeding in the house, but as this is open to the elements (and cats) we've had to cover it with a tarpaulin.



Soon, the scaffolding can come down, we just need to get the soil pipes in place, and the chimney pressure tested; however, we wait on the holidays and the weather.

No comments:

Post a Comment